Every project below lists what it cost and how long it took. Ranges, because your house isn't theirs — but real ones.
Wall removed between kitchen and dining, new services, cabinetry and floors through the main level.
$78–92k · 9 weeks
Underpinned to 8'2", waterproofed, two bedrooms, bath and a separate entrance. Permits and inspections throughout.
$110–140k · 14 weeks
Single-storey rear addition, new footings, family room and mudroom, roof tied into the existing line.
$165–195k · 20 weeks
Main bath and ensuite, both stripped to studs. Failed membrane in the ensuite found and put right.
$41–52k · 6 weeks
Kitchen, two baths, floors, paint and electrical brought up to code across 1,900 sq ft. Family stayed in through it.
$140–170k · 16 weeks
Unpermitted basement finished by someone else. Opened up, corrected, inspected and signed off.
$26–34k · 5 weeks
The estimator gets you close in a minute. A visit gets you exact.